Gateway 2 Explained: Requirements, Challenges and How to Get Approval First Time

Steel framing systems installation on a new residential building site

Gateway 2 Explained – What Architects and Contractors Need to Know

Since the introduction of the Building Safety Act 2022, Gateway 2 has become one of the most critical stages in the design and construction process for higher-risk buildings (HRBs).

For architects, contractors, and developers, Gateway 2 represents a fundamental shift in how projects are designed, specified, and delivered – with far greater scrutiny on compliance, materials, and technical documentation.

With approval delays and high rejection rates continuing across the industry, understanding Gateway 2 requirements and preparing submissions correctly has never been more important.

What Is Gateway 2?

Gateway 2 is the second of three regulatory “gateways” introduced under the UK Building Safety Act.

It takes place before construction begins on higher-risk buildings and requires approval from the Building Safety Regulator (BSR).

Gateway 2 is effectively a hard stop in the project lifecycle.

Construction cannot start until the design has been fully reviewed and approved by the BSR.

At this stage, project teams must demonstrate that:

  • The building design complies with UK Building Regulations

  • Fire safety risks have been addressed

  • Materials and systems are clearly specified

  • Roles and responsibilities are defined

  • Technical documentation is complete and accurate

Why Gateway 2 Is Causing Delays Across the Industry

Across the UK construction sector, Gateway 2 submissions are facing significant challenges.

Many applications are being delayed or rejected due to:

  • Incomplete technical documentation

  • Unclear or inconsistent specifications

  • Missing product certifications

  • Late design changes

  • Insufficient fire safety information

For many projects, this has led to extended timelines, increased costs, and uncertainty for developers and contractors.

The key lesson is clear: Getting Gateway 2 submissions right first time is essential.

What Gateway 2 Means for Architects

For architects, Gateway 2 requires a much higher level of design completion earlier in the project lifecycle.

Key Implications for Architects

  • Designs must be developed to RIBA Stage 4 before submission
  • Façade, structural, and internal systems must be fully defined
  • Product selections must be supported by technical data and certification
  • Late-stage design changes become difficult and risky

Architects must also work more closely with suppliers and technical specialists to ensure that specifications are realistic, compliant, and buildable.

What Gateway 2 Means for Contractors

For contractors, Gateway 2 fundamentally changes how projects are delivered.

Key Implications for Contractors

  • Construction must follow the approved design exactly

  • Any deviation may trigger a re-approval process

  • Greater scrutiny is placed on materials, methods, and competence

  • Early collaboration with design teams becomes essential

This means that contractors must be confident that the specified systems – from SFS and drylining to façades and insulation – are compliant, documented, and available.

How Stud Track & Ceiling Supplies Can Support Gateway 2 Submissions

At Stud Track & Ceiling Supplies, we work closely with architects and contractors to help ensure that system specifications and documentation meet Gateway 2 requirements.

Technical Support and Specification Assistance

We provide:

    • Detailed system information for SFS and drylining

    • Product certifications and technical data

    • Guidance on compliant system build-ups

    • Support for material selection and specification

Design and Material Support

Our team can also assist with:

    • Indicative SFS designs and material take-offs

    • Clarification of system performance and compliance

    • Coordination between design intent and buildability

By involving suppliers earlier in the design process, project teams can reduce risk, avoid delays, and strengthen Gateway 2 submissions.

Need Support with Compliant Systems and Specifications?

If you’re preparing a project for Gateway 2 approval, our team can support you with compliant SFS and drylining systems, technical documentation, and specification guidance.

📞 Call us on 0121 720 0694 or request a quote today.

Need prices, availability, or technical advice? Request a call back and speak directly to our team.
Fast reponse. no obligation.

REQUEST A CALL BACK


stud track and ceiling supplies logo in white and light blue

FREE* INDICATIVE DESIGN

Free SFS Full Design & Material Take off Service for projects over 1000m²

To enable us to assess the requirements of the project and suggest a suitable specification for the steel framing system, please complete as many of the boxes below as possible or appropriate.

* Free Indicative Design for Quotation purposes


Need pricing for your next project? Whether it’s drylining, SFS, ceilings, cladding, or fixings – we’ve got you covered. Fill in your details and our expert team will be in touch shortly.

Get a Free Quote!